Skip to content
Stratton & Coke

03 / Sectors

Six sectors, one standard.

Sector knowledge shows up in method, not marketing. Vibration limits beside an emergency department, in-stream windows on a watercourse, slab tolerances under automated racking. The constraints differ, the discipline does not.

Interior of a completed distribution facility with overhead crane rails
Sector A

Industrial & Logistics

Distribution, cold-chain, manufacturing and port-adjacent facilities where throughput dictates the design.

  • Cold-chain and controlled-atmosphere builds
  • Heavy slab and racking coordination
  • Rail and marine interface works

Projects in this sector

Completed commercial mid-rise seen from street level
Sector B

Commercial & Workplace

Office, campus and retail assets built to attract tenants and hold their value over a 40-year life.

  • Mass-timber and hybrid structures
  • Step Code 4 envelope delivery
  • Occupied-building tenant works

Projects in this sector

Glass-clad institutional building viewed from the base
Sector C

Institutional & Healthcare

Health authority, post-secondary and civic facilities delivered under infection-control and continuity constraints.

  • ICRA containment protocols
  • Shielded imaging and lab environments
  • Public-sector reporting and audit

Projects in this sector

Completed multi-family residential building exterior
Sector D

Multi-Family Residential

Concrete and wood-frame rental, strata and below-market housing with self-perform structural crews.

  • Four-day cast-in-place floor cycles
  • Encapsulated mass-timber mid-rise
  • Rental pro forma cost discipline

Projects in this sector

Aerial view of a highway interchange and corridor works
Sector E

Infrastructure & Energy

District energy, water, transportation and utility works executed inside regulated windows.

  • In-stream and environmental windows
  • Live-traffic staging plans
  • Utility tie-ins and commissioning
Scaffolding and shoring during a building envelope renewal
Sector F

Renewal & Retrofit

Seismic strengthening, envelope renewal and modernization on assets that must remain in service.

  • Seismic upgrades to BCBC 2024
  • Rainscreen and envelope renewal
  • Multi-year capital staging

Bid & Preconstruction

Building in one of these sectors?

Send drawings, a scope narrative or an invitation to tender. Our preconstruction team responds to every qualified invitation within two business days.

Request a bid