2023 · Industrial · Port of Vancouver, BC
Pacific Harbour Terminal
- Contract value
- $420M
- Delivery model
- Construction Management
- Area
- 1,180,000 sq ft
- Duration
- 38 months
- Client
- Coastwise Terminals LP
- Consultant
- Marrow Bell Architecture
- Status
- Completed
- Location
- Port of Vancouver, BC
Project narrative
A deep-water intermodal terminal and cold-chain distribution facility built on reclaimed foreshore, delivered while the adjacent berth stayed in continuous operation.
The challenge
The site sat on 14 metres of marine fill with a liquefaction risk that ruled out conventional spread footings. Terminal operations could not pause, which capped daytime crane movements and restricted laydown to a 40-metre corridor.
Our approach
We self-performed 2,400 stone columns for ground improvement and sequenced the structural steel from a barge rather than the landside yard. A 4D model tied every pick to the berth schedule, and night pours kept the 62,000 m³ of concrete off the operator's peak hours.
The outcome
Substantial completion landed three weeks ahead of the contract date with a final cost 1.8% under the guaranteed maximum price. Zero lost-time incidents across 1.9 million worker hours.

Interior of the completed distribution hall with overhead crane rails
Measured outcomes
- 62,000 m³
- Concrete placed
- 8,400 tonnes
- Structural steel
- 1.9M
- Worker hours
- −21 days
- Schedule variance
Site record