Pacific Harbour Terminal in Port of Vancouver, BC

2023 · Industrial · Port of Vancouver, BC

Pacific Harbour Terminal

Contract value
$420M
Delivery model
Construction Management
Area
1,180,000 sq ft
Duration
38 months
Client
Coastwise Terminals LP
Consultant
Marrow Bell Architecture
Status
Completed
Location
Port of Vancouver, BC

Project narrative

A deep-water intermodal terminal and cold-chain distribution facility built on reclaimed foreshore, delivered while the adjacent berth stayed in continuous operation.

The challenge

The site sat on 14 metres of marine fill with a liquefaction risk that ruled out conventional spread footings. Terminal operations could not pause, which capped daytime crane movements and restricted laydown to a 40-metre corridor.

Our approach

We self-performed 2,400 stone columns for ground improvement and sequenced the structural steel from a barge rather than the landside yard. A 4D model tied every pick to the berth schedule, and night pours kept the 62,000 m³ of concrete off the operator's peak hours.

The outcome

Substantial completion landed three weeks ahead of the contract date with a final cost 1.8% under the guaranteed maximum price. Zero lost-time incidents across 1.9 million worker hours.

Interior of the completed distribution hall with overhead crane rails

Interior of the completed distribution hall with overhead crane rails

Measured outcomes

62,000 m³
Concrete placed
8,400 tonnes
Structural steel
1.9M
Worker hours
−21 days
Schedule variance

Site record

Crew finishing a concrete slab pour on the terminal apron
Crew finishing a concrete slab pour on the terminal apron
Tower cranes above the terminal structure during erection
Tower cranes above the terminal structure during erection