01 / Capabilities

Six ways we deliver a project.

Delivery model is a commercial decision, not a preference. We advise on the model that carries the least risk for your programme, then staff it with the same preconstruction and site team from award through warranty.

General Contracting with Stratton & Coke crews at work
Typical value
$8M to $180M
Contract form
CCDC 2 (2020)
Lead-in
6 to 10 weeks from award
01.1

General Contracting

Stipulated-price and design-bid-build delivery led by a dedicated superintendent and project manager. Our self-perform concrete and formwork divisions hold the critical path in-house, so schedule risk sits with us rather than a subtrade queue.

Scope of work

  • Stipulated-price (lump sum) and unit-price contracts
  • Self-perform cast-in-place concrete, formwork and rebar placement
  • Full site supervision, hoisting and logistics planning
  • Trade procurement, tender analysis and buyout
  • Quality control, deficiency tracking and commissioning support

Capability 1 of 6

Construction Management with Stratton & Coke crews at work
Typical value
$25M to $420M
Contract form
CCDC 5B (2010)
Lead-in
Concurrent with design
01.2

Construction Management

Where an owner needs early market pricing and phased trade awards, we act as construction manager at risk. Every buyout, allowance and contingency draw is visible in a shared cost report issued monthly with the progress claim.

Scope of work

  • CM-at-risk and CM-as-agent mandates
  • Open-book cost reporting with monthly reconciliation
  • Phased tendering and early works packages
  • Guaranteed maximum price at 60% design development
  • Owner, consultant and authority-having-jurisdiction coordination

Capability 2 of 6

Design-Build with Stratton & Coke crews at work
Typical value
$15M to $250M
Contract form
CCDC 14 (2013)
Programme saving
12 to 20 weeks typical
01.3

Design-Build

A single point of accountability for design and construction. We assemble the consultant team, carry the design risk and compress the programme by overlapping permitting, long-lead procurement and site enabling works.

Scope of work

  • Consultant team assembly and design management
  • Bridging document and performance-specification review
  • Long-lead equipment procurement during permitting
  • Building-envelope and energy-step-code coordination
  • Single-contract warranty and turnover

Capability 3 of 6

Preconstruction with Stratton & Coke crews at work
Engagement
Fixed-fee or credited to contract
Estimate standard
CIQS elemental format
Turnaround
Class D in 10 business days
01.4

Preconstruction

Preconstruction is a discipline here, not a courtesy. Class D through Class A estimates, elemental cost planning to CIQS standards, 4D sequencing and constructability review are produced by the same team that will build the project.

Scope of work

  • Class D, C, B and A estimates with elemental breakdown
  • Value-engineering and life-cycle cost options analysis
  • 4D schedule modelling and site logistics planning
  • Permit strategy and municipal approvals sequencing
  • Subsurface, hazmat and existing-conditions due diligence

Capability 4 of 6

Tenant Improvements with Stratton & Coke crews at work
Typical value
$500K to $18M
Typical duration
8 to 30 weeks
Crew model
Dedicated TI division
01.5

Tenant Improvements

Office, clinical and retail fit-outs delivered in live buildings. Night and weekend shifts, dust and noise mitigation, negative-air containment and landlord coordination are planned into the schedule from the first site walk.

Scope of work

  • Office, clinical, laboratory and retail fit-outs
  • Occupied-premises phasing and after-hours execution
  • Infection-control and dust-containment protocols
  • Base-building and landlord works coordination
  • Furniture, fixture and low-voltage integration

Capability 5 of 6

Building Upgrades with Stratton & Coke crews at work
Typical value
$2M to $60M
Occupancy
Phased, building in service
Reference standard
BCBC 2024, ASTM E2018
01.6

Building Upgrades

Structural strengthening, building-envelope renewal and mechanical replacement on assets that must stay in service. We work from condition assessments and depreciation reports to stage work across multiple fiscal years.

Scope of work

  • Seismic upgrades to current BC Building Code provisions
  • Building-envelope renewal and rainscreen replacement
  • Mechanical, electrical and elevator modernization
  • Multi-year capital-plan staging for owners and strata
  • Heritage and hazardous-materials abatement coordination

Capability 6 of 6

Bid & Preconstruction

Tell us which model fits your programme.

Send drawings, a scope narrative or an invitation to tender. Our preconstruction team responds to every qualified invitation within two business days.