Skip to content
Stratton & Coke
Vernon Tech Campus in Vernon, BC

2024 · Commercial · Vernon, BC

Vernon Tech Campus

Contract value
$185M
Delivery model
Design-Build
Area
340,000 sq ft
Duration
31 months
Client
Okanagan Innovation Trust
Consultant
Stratton & Coke design-build team with Fenwick Studio
Status
Active
Location
Vernon, BC

Project narrative

Three interconnected mass-timber office blocks and a central utility plant forming a Step Code 4 research campus in the North Okanagan.

The challenge

The trust needed occupancy for an anchor tenant 20 months after award, well inside a conventional design-bid-build programme, and the mass-timber supply chain carried a 34-week lead time.

Our approach

Design-build let us release the glulam package at 45% design development and pour foundations under an early-works permit. Panelized envelope assemblies were fabricated off site in Armstrong, cutting field envelope work from 22 weeks to nine.

The outcome

Block A reached occupancy on the anchor tenant's date. Blocks B and C remain on programme for 2026, with the campus tracking 41% below the reference building's energy-use intensity.

Detail of the completed curtain wall and canopy geometry

Detail of the completed curtain wall and canopy geometry

Measured outcomes

4,100 m³
Mass timber
−41% EUI
Energy intensity
78% panelized
Off-site envelope
$61M
Local trade spend

Site record

Site superintendent and project coordinator reviewing shop drawings
Site superintendent and project coordinator reviewing shop drawings
Trade worker cutting steel connection plates on site
Trade worker cutting steel connection plates on site

Bid & Preconstruction

Ready to put us on your bid list?

Send drawings, a scope narrative or an invitation to tender. Our preconstruction team responds to every qualified invitation within two business days.

Request a bid